Our projects

Projects in Poland and the EU

Hundreds of office partition, acoustic booth and industrial system projects. We select the system, height, infill and fabric for the specific space: an office, an open space or a hall.

  • One supplierFrom quiet workstations in Warsaw and Berlin to solid soundproofing of production halls in Wrocław and Prague.
  • Systems in actionSee how acoustic booths for offices (DOT, M, L), System 20 and System 32 partitions and SEAL desk panels perform in practice.
  • Reduction scaleA real reduction of noise nuisance by 11–15 dB (partitions) and up to 35 dB (acoustic booths).
  • EU coverageFull logistics and installation service across the European Union (intra-Community supply at 0% VAT and reverse charge).

Coverage and service

Delivery and installation across the European Union

Hundreds of projects, not only in Poland but also in other EU countries, prove our experience in fighting acoustic smog. As a proven international partner we make purchasing smooth for foreign companies. For delivery of goods only we apply the intra-Community supply procedure (0% VAT), and for projects including installation we use the reverse charge mechanism. You will find more about selling to the EU in our tax guide.

Guide to selling to the EU

Frequently asked questions

Can the XL acoustic booth or System 32 partitions be installed by ourselves?

We design most office systems (e.g. SEAL, System 20) for intuitive installation. For large industrial structures or XL booths, however, we recommend our installation team: this preserves the sound insulation (up to 35 dB) and the full safety of the structure.

How quickly do you deliver ordered systems to EU countries?

Production takes 3–4 weeks (for partitions and smaller booths) up to 6 weeks (for large and non-standard orders). We agree the delivery schedule in advance, around the rhythm of your office or hall.

Do System 32 partitions require drilling into an industrial floor?

For maximum stability where forklifts operate, we often anchor with dowels. If the client does not want the floor touched, System 32 can stand on special wide stabilising feet and remain a 100% mobile structure.

What certificates do the materials used in industrial projects have?

The Professional series infills used in the Smart Wall and Q systems have a certified reaction-to-fire class and hygiene certificates. If you can't see the certificate you need on our website, write to us.

Want a similar project?

Describe the space, the number of workstations and the deadline. We will select a system and prepare a quote, usually within 24 hours. Net prices, excluding delivery.