Our projects
Projects in Poland and the EU
Hundreds of office partition, acoustic booth and industrial system projects. We select the system, height, infill and fabric for the specific space: an office, an open space or a hall.
- Acoustic booths · Warsaw Acoustic booths in Warsaw: two-person M booths as a meeting zone in a loud open space Our client in Warsaw runs a dynamic sales team where the phone never stops ringing. In their open-plan office, "acoustic smog" had become a barrier not only… View project
- Office partitions · Kielce Modern office partitions in Kielce: how we quietened a call centre without turning it into a "dark room" Call centre workstations needed sound insulation without cutting off daylight. View project
- Production hall · Wrocław Modern modular partitions in Wrocław: how to quieten a hall without "dark boxes" or downtime? A quiet supervision zone in a loud production hall, without building work or production downtime. View project
- Office partitions · Warsaw Acoustic office partitions in Warsaw: how to quieten an engineering office in 2 days (without drilling into desks!) An engineering office with 50 workstations had to be quietened without touching furniture or floors, during normal working hours. View project
- Warehouse · Gdańsk Modular partitions in Gdańsk: how to shield an office from frost and noise in a warehouse? Separating an office and shipping zone in a loud hall, without masonry and with the option to rearrange. View project
- Office partitions · Poznań Office acoustics in Poznań: an energetic makeover of a design office Noise from the central corridor and colleagues distracting each other with conversations: the design office needed quiet without grey corporate aesthetics. View project
- Office partitions · Koszalin Office partitions in Koszalin: how System 20 brought order to a new office at a manufacturing company No acoustic barrier between workstations at double desks, and a tangle of cables during the IT installation. View project
Coverage and service
Delivery and installation across the European Union
Hundreds of projects, not only in Poland but also in other EU countries, prove our experience in fighting acoustic smog. As a proven international partner we make purchasing smooth for foreign companies. For delivery of goods only we apply the intra-Community supply procedure (0% VAT), and for projects including installation we use the reverse charge mechanism. You will find more about selling to the EU in our tax guide.
Guide to selling to the EUFrequently asked questions
Can the XL acoustic booth or System 32 partitions be installed by ourselves?
We design most office systems (e.g. SEAL, System 20) for intuitive installation. For large industrial structures or XL booths, however, we recommend our installation team: this preserves the sound insulation (up to 35 dB) and the full safety of the structure.
How quickly do you deliver ordered systems to EU countries?
Production takes 3–4 weeks (for partitions and smaller booths) up to 6 weeks (for large and non-standard orders). We agree the delivery schedule in advance, around the rhythm of your office or hall.
Do System 32 partitions require drilling into an industrial floor?
For maximum stability where forklifts operate, we often anchor with dowels. If the client does not want the floor touched, System 32 can stand on special wide stabilising feet and remain a 100% mobile structure.
What certificates do the materials used in industrial projects have?
The Professional series infills used in the Smart Wall and Q systems have a certified reaction-to-fire class and hygiene certificates. If you can't see the certificate you need on our website, write to us.
Want a similar project?
Describe the space, the number of workstations and the deadline. We will select a system and prepare a quote, usually within 24 hours. Net prices, excluding delivery.







