Modular partitions in Gdańsk: how to shield an office from frost and noise in a warehouse?

Room enclosed with System 32 partitions in a warehouse in Gdańsk
Goal
Separating an office and shipping zone in a loud hall near Gdańsk.
System
The "armoured" System 32, 182 cm high (solid board + plexiglass from 117 cm).
Problems solved
Machine noise, draughts from the warehouse gate, no way to air-condition the workstations.
Installation
A stable structure fixed to the floor with dowels, ready to be rearranged in the future.

Challenge

An office on the front line next to an open gate

Working in the shipping preparation area of a hall near Gdańsk can be extreme in winter. Our client faced three problems: loud machine noise, icy blasts of air every time the warehouse gate opened, and no way to cool the workstations effectively in summer. On windy days an open gate meant documents blown off the desks. Traditional plasterboard construction was out of the question: the system had to go up quickly and be movable as the company grows.

Solution

System 32: a solid barrier that holds the climate

We chose System 32, which thanks to its square profile and rigidity works perfectly in industrial conditions.

  • Thermal and acoustic insulationThe 182 cm partitions created a physical barrier that cut the office zone off from draughts. This made a closed air circulation possible, so it is warm inside in winter and the air conditioning can finally be used in summer.
  • Privacy without isolation from the teamThe lower part of the partitions (up to 117 cm) is solid furniture board, which provides visual separation and protects against noise. Above it we used clear plexiglass, so the supervisors can see what is happening in the hall and daylight comes in.
  • Rock-solid stabilityBecause of forklift traffic and the pace of work in the hall, the system was set on feet and additionally fixed to the floor with dowels. This gives the structure maximum safety while keeping it fully mobile for the future.

Result

Final result

The loud, freezing space became a professional control centre. Less noise (a reduction of approx. 11–15 dB) helps concentration, and a stable temperature lets the team focus on work rather than fighting the weather. The client got a system that grows together with the business.

Systems used

Questions about this project

Do System 32 partitions protect against draughts?

Yes. Thanks to their 182 cm height and solid infills in the lower part, the system works like a protective screen. It effectively blocks cold air from the warehouse gates, which greatly improves the employees' thermal comfort.

Does installation require stopping work in the hall?

Absolutely not. Installation is "dry", with no dust or welding. We set up the whole office and shipping zone in Gdańsk in just a few hours, without interrupting the client's logistics.

What if I need to enlarge the shipping zone in a year?

System 32 is fully reconfigurable. Even though it is anchored to the floor, the partitions can be dismantled at any time, moved elsewhere or extended with new modules without buying a whole new system.